What Is the D8 Step in 8D? #
The D8 Step: Team Recognition and 8D Closure, is the final discipline of the 8D Problem-Solving process.
It focuses on officially closing the 8D report, sharing lessons learned, and most importantly, recognizing the contribution of the cross-functional team (CFT) that solved the problem.
“A solved problem deserves closure, a learned lesson deserves recognition.”
D8 helps to create culture of continuous improvement.
Therefore the Objective of D8 is to:
- Formally close the 8D report with approvals from all stakeholders.
- Ensure all corrective and preventive actions are complete and verified.
- Celebrate and recognize the team’s contribution.
- Capture lessons learned and share them across departments.
How to do Team Recognition and 8D Closure using step D8? (Explained) #
In 8D Analysis D8 step includes the final summary and closure section, which contains:
- Prepared By / Reviewed By / Approved By fields
- 8D Closure Date
- Effectiveness Verification / Evidence
- Customer Approval (if applicable)
Let’s go through how to complete this section for our example.
Summarize All D Steps #
Example 8D Summary Table:
| Step | Summary |
| D0 | Problem awareness: Weld spatter and weak joint on LH seat-frame bracket. |
| D1 | Team formed with members from Quality, Production, Maintenance, and Design. |
| D2 | Problem defined using 5W2H – 40 pcs rejected, 20,000 PPM, critical safety concern. |
| D3 | Containment: 100% inspection completed; all suspect parts isolated and reworked. |
| D4 | Root cause: Worn gas regulator O-ring (occurrence); poor lighting at inspection (non-detection). |
| D5 | Corrective actions: Replace regulator, update PM checklist, install gas-flow indicator, upgrade lighting. |
| D6 | Validation: 0 defects in 3 subsequent lots; SPC shows stable gas flow. |
| D7 | Prevention: Updated Control Plan, PFMEA, and training; implemented across all welding lines. |
| D8 | Closure: 8D verified effective, team recognized, and lesson added to knowledge base. |
Verification of Effectiveness #
Reconfirm that all implemented actions have proven their effectiveness and that no recurrence has been observed.
Verification Evidence:
- SPC Chart – stable gas flow (10 ± 0.3 LPM).
- PPM Trend – reduced from 20,000 to 0.
- Audit confirmation – verified during internal audit on 30 Oct 2025.
- Customer feedback – “No further issues reported” (XYZ Motors mail dated 10 Nov 2025).
Effectiveness verified and issue closed successfully.
Approvals and Sign-Off #
You need to do a key sign-off to close the 8D report:
| Role | Name | Responsibility |
| Prepared By (Champion) | Rahul Patil | Team Leader – Prepared report and coordinated actions. |
| Reviewed By | Rajesh Kulkarni | Quality Manager – Verified data and system updates. |
| Approved By | Customer Representative / Plant Head | Confirmed effectiveness and authorized closure. |
8D Closure Date: 15 Nov 2025
Customer Approval: Received from XYZ Motors on 16 Nov 2025.
This section concludes the completion of your 8D report and act as a traceable record for audits.
Recognize the Team #
Acknowledging team members ensures engagement and encourages collaboration in future projects.
Recognition Ideas:
- Send appreciation e-mails or display certificates on notice boards.
- Announce successful closure during weekly quality meetings.
- Include team photo in “8D Success Stories” folder.
- Reward consistent contributors during management reviews.
Example Note in Report (Remarks Section):
“8D successfully closed within 25 days. Cross-functional team showed excellent collaboration in root cause validation and implementation. Appreciation certificates issued to all members.”
Team Members Recognized:
- Rahul Patil – Quality Engineer (Leader)
- Meena Joshi – Production Supervisor
- Kiran Deshmukh – Maintenance Engineer
- Priya Shah – Design Engineer
- Amit Kumar – Welding Operator
Communicate Closure to the Customer #
A professional closure e-mail and 8D report summary should be sent to your OEM / customer.
Example Closure Communication:
Subject: 8D Report Closure – Weld Spatter Issue on LH Seat Frame Bracket
Dear [Customer Name],
We are pleased to inform you that the 8D for the weld spatter issue has been completed and verified effective.
- Root causes identified and permanently corrected.
- Preventive actions implemented across all lines.
- No recurrence observed in three successive lots.
Please find attached the signed 8D report and verification data.
Regards,
Rahul Patil
Quality Team Leader – ABC Components Pvt Ltd
Summary of Team Recognition and 8D Closure step #
- D8 finalizes the 8D process with verified closure and team recognition.
- Confirm all actions are complete, documented, and effective.
- Recognize and appreciate the cross-functional team’s contribution.
- Record lessons learned for future reference and share across the organization.
- Customer acknowledgment and final signatures complete the report.
“The best quality culture doesn’t just fix problems, it celebrates those who prevent them.”